Pictures are starting to come in from the boys as they settled into life in Lima and commenced the final preparations before scrutineering. The truck needed to be located along with the support car and shipping container, the bikes collected from the freight terminal and everything packed in the truck. All of the navigation gear and graphics were fitted to the bikes and quad before they were all fed through scrutineering one by one.


Pictures from Todd Smith:

Official beer. Very important!

Official beer. Very important!

View from the ceremonial start.

View from the ceremonial start.

View from the ceremonial start.

View from the ceremonial start.

The GHR war room.

The GHR war room. From left: Rob, Glenn, Simon and Jake.


Pictures from Pete Wilhelms:

The GHR service truck.

The GHR service truck.

The bikes made it safe and sound.

The bikes made it safe and sound.

Rob and Jake starting to unpack.

Rob and Jake starting to unpack.

Todd Smith and his bike assembled ready to go.

Todd Smith and his bike assembled ready to go.

The boys assembling another bike.

The boys assembling another bike.

The container has been located.

The container has been located.

The GHR service car.

The GHR service car.

Inside the GHR service car.

Inside the GHR service car.

Fitting the rack units to the truck for the first time.

Fitting the rack units to the truck for the first time.

Final checks on the equipment.

Final checks on the equipment.

Ready to go!

Ready to go!

Graphics applied and final assembly done before scrutineering.

Graphics applied and final assembly done before scrutineering.

Paul Smith and quad.

Paul Smith and quad.

Dakar HQ and scrutineering awaits.

Dakar HQ and scrutineering awaits.

Paul Smith sizing up the competition.

Paul Smith sizing up the competition.

 

Pictures from Glen Grundy:

Scrutineering is all about waiting your turn.

Scrutineering is all about waiting your turn. I think it was 5 hours for Glen.

Glen running through scrutineering.

Glen running through scrutineering.

Navigation gear all in place.

Navigation gear all in place.

Pictures from Brett Cummings:

Paul and Todd going through documentation.

Paul and Todd going through documentation. Fellow Aussie Rod Faggotter in the background.

 

Glen's bike in foreground, Brett's behind.

Glen's bike in foreground, Brett's behind.

Off to scrutineering!

Off to scrutineering!

A hive of activity at Dakar HQ.

A hive of activity at Dakar HQ.

A long time in the planning, but it's now official. Brett Cummings, #89.

A long time in the planning, but it's now official. Brett Cummings, #89.

Pictures from Paul Smith:

Look out Dakar, Smitty's here.

Look out Dakar, Smitty's here.

Paul's office view for two weeks.

Paul's office view for two weeks.

The GHR service truck all fitted with racks, Armourboy cases and Rolacases.

The GHR service truck all fitted with racks, Armourboy cases and Rolacases.

Ready for service, the GHR support car.

Ready for service, the GHR support car.

Paul's quad at scrutineering with Todd.

Paul's TRX700XX quad at scrutineering with Todd's CRF450X.